CNT ENGINEERS undertakes Statutory Approval work for New EHT Switchyards, HT Switchyards, Power Transformers, Distribution Transformers, Main LT Power Panel, DG Sets, Solar Plant & EOT Crane.
Statutory Approvals work of
❖ EHT Power Transmission Line Tower Installation
♦ EHT Power Transmission Line Galvanized Steel Tower Installation
❖ New EHT Switchyard Installation
♦ New EHT Substation Structure Installation
♦ New EHT Isolator Installation
♦ New EHT CVT Installation
♦ New EHT CT Installation
♦ New EHT PT Installation
♦ New EHT SF6 Breaker Installation
♦ New EHT Electricity Meter Kiosk Installation
❖ New EHT Power Transformer Installation
♦ New EHT Power Transformer Installation
♦ New EHT Neutral Current Transformer Installation
♦ New EHT Neutral Grounding Transformer Installation
♦ New EHT Substation Transformer Installation
❖ HT Power Transmission Line Tower Installation
♦ HT Power Transmission Line Galvanized Steel Tower Installation
❖ New HT Switchyard Installation
♦ New HT Switchyard Structure Installation
♦ New HT Capacitor Bank Installation
♦ New HT Series Reactor Installation
♦ New HT RVT Installation
♦ New HT PT Installation
♦ New HT CT Installation
♦ New HT NCT Installation
♦ New HT APFC System Installation
♦ New HT SF6 Breaker Installation
♦ New HT Outdoor Vaccum Circuit Breaker Installation
♦ New HT Indoor Vaccum Circuit Breaker Installation
♦ New HT Indoor Oil Circuit Breaker Installation
♦ New HT Indoor Minimum Oil Circuit Breaker Installation
♦ New HT Outdoor RMU Installation
♦ New HT G.O.D. Breaker Installation
♦ New HT Outdoor Lightening Arrestor Installation
♦ New HT Indoor Lightening Arrestor Installation
♦ New HT Electricity Meter Kiosk Installation
♦ New HT Breaker Panel Installation
♦ New RTCC Panel Installation
❖ New HT Power Transformer
♦ New HT Oil Filled Power Transformer Installation
♦ New HT Epoxy Dry Type Power Transformer Installation
♦ New HT Oil Filled Distribution Transformer Installation
♦ New HT Epoxy Dry Type Distribution Transformer Installation
♦ New HT RTCC Panel Installation
♦ New HT Solar Transformer Installation
❖ New LT Lighting Transformer Installation
♦ New LT Auto Transformer Installation
♦ New LT Servo Transformer Installation
♦ New LT Delta-Star Transformer Installation
❖ New Main LT Power Panel Installation
♦ New LT Main Breaker Panels Installation
♦ New LT Air Circuit Breaker Installation
♦ New LT Oil Circuit Breaker Installation
♦ New LT Electricity Meters Installation
♦ New LT Capacitor Bank Installation
♦ New APFC Panels Installation
❖ New DG Sets
♦ New Diesel Generator Installation
♦ New DG Panel Installation
❖ New Earthing Pit Installation
♦ New GI Pipe Earthing Pit Installation
♦ New GI Plate Earthing Pit Installation
♦ New Cast Iron Plate Earthing Pit Installation
♦ New Copper Plate Earthing Pit Installation
♦ New Chemical Earthing Pit Installation
♦ New GI Strip Laying Installation
♦ New Copper Strip Laying Installation
❖ New Solar Plant Installation
♦ New Solar Panel Installation
⚏ New On-grid Solar Panel Installation
⚏ New Off-grid Solar Panel Installation
⚏ New Hybrid Rooftop Solar Panel Installation
♦ New Solar Panel Mounting Structure Installation
♦ New Rooftop Solar Panel Installation
♦ New Solar Charge Controller Installation
♦ New Solar Invertor Installation
♦ New Solar Batteries Installation
♦ New Solar Electricity Meters Installation
❖ New EOT Crane Installation
♦ New Hoist, Micro-Hoist, Long, Horizontal Drive Panel Installation
♦ New Veriable Frequency Drive Panel Installation
♦ New Radio Remote Controller Panel Installation
❖ New Electricity Meters Installation
♦ New Single Phase Whole Current Meters (10 to 60A) Installation
♦ New Three Phase Whole Current Meters (20 to 100A) Installation
♦ New Three Phase Four Wire LTCT (5 to 10A) Installation
♦ New Three Phase Four Wire HTCT 3x63.5V (5 to 10A) Installation
♦ New Panel Mounted Power Quality Meters with communication facility Installation
♦ New Calibrated Electricity Meters Installation
❖ New Lifts
♦ New Lift driven by AC Electric Motor Installation
♦ New Lift driven by DC Electric Motor Installation
♦ New Lift Gearless Installation
Customer
CNT ENGINEERS B2B customers are listed public and private limited companies across India.
Customer We Served
Regulator
Tushar Shinde is the founder, promoter and CEO of CNT ENGINEERS established in year 2004.
Contact us
✆ 9321690034
✆ 9320690034
✆ 9820690034
✉ cnt@cnt.org.in
www.cnt.org.in

Tushar Shinde
CEO
CNT ENGINEERS
Registered Address :
202, Rachana Apartment, Anand Nagar
Kulgaon, Badlapur (E)
Thane - 421503
Maharashtra
India
Marketing Office :
B/402, Lotus Corporate Park
Laxmi Nagar, Goregaon (E)
Mumbai - 400063
Maharashtra
India
Regional Office :
Masat Industrial Area
Silvassa Vapi Road
Samarvarni, Silvassa
Dadra & Nagar Haveli - 396230
Dadra & Nagar Haveli & Daman and Diu
India
Regional Office :
Pithampur Industrial Area
Mhow Nimach Road
Akolia, Pithampur
Dhar - 454775
Madhya Pradesh
India