Repair
CNT undertake at works Repair, Overhauling, Maintenance & Testing of Distribution Transformers, Current Transformers, Potential Transformers & Current Limiting Reactors.

Repair of Oil Filled Power Transformer
❖ Repairing of fail/burn Power Transformer
❖ Re-winding Power Transformer
❖ Re-insulation Power Transformer
❖ Oil Replacement, Drying & IR value improvement of Power Transformer
❖ Vacuum Drying & IR Value improvement of Power Transformer
❖ Nitrogen Drying & IR Value improvement of Power Transformer
❖ Vapor Phase Drying & IR Value improvement of Power Transformer
Repair of Oil Filled Distribution Transformer
❖ Repairing of fail/burn Distribution Transformer
❖ Re-winding Distribution Transformer
❖ Re-insulation Distribution Transformer
❖ Oil Replacement, Drying & IR value improvement of Distribution Transformer
❖ Vacuum Drying & IR Value improvement of Distribution Transformer
❖ Nitrogen Drying & IR Value improvement of Distribution Transformer
❖ Vapor Phase Drying & IR Value improvement of Distribution Transformer
Repair of Oil Filled Current Transformer
❖ Repairing of fail/burn Current Transformer
❖ Re-winding Current Transformer
❖ Re-insulation of Current Transformer
❖ Oil Replacement, Drying & IR value improvement of Current Transformer
❖ Vacuum Drying & IR Value improvement of Current Transformer
❖ Nitrogen Drying & IR Value improvement of Current Transformer
❖ Vapor Phase Drying & IR Value improvement of Current Transformer
Repair of Oil Filled Potential Transformer
❖ Repairing of fail/burn Potential Transformer
❖ Re-winding of Potential Transformer
❖ Re-insulation of Potential Transformer
❖ Oil Replacement, Drying & IR value improvement of Potential Transformer
❖ Vacuum Drying & IR Value improvement of Potential Transformer
❖ Nitrogen Drying & IR Value improvement of Potential Transformer
❖ Vapor Phase Drying & IR Value improvement of Potential Transformer
Repair of Oil Filled Residual Voltage Transformer
❖ Repairing of fail/burn Residual Voltage Transformer
❖ Re-winding of Residual Voltage Transformer
❖ Re-insulation of Residual Voltage Transformer
❖ Oil Replacement, Drying & IR value improvement of Residual Voltage Transformer
❖ Vacuum Drying & IR Value improvement of Residual Voltage Transformer
❖ Nitrogen Drying & IR Value improvement of Residual Voltage Transformer
❖ Vapor Phase Drying & IR Value improvement of Residual Voltage Transformer
Repair of Oil Filled Current Limiting Reactor
❖ Repairing of fail/burn Current Limiting Reactor
❖ Re-winding of Current Limiting Reactor
❖ Re-insulation of Current Limiting Reactor
❖ Oil Replacement, Drying & IR value improvement of Current Limiting Reactor
❖ Vacuum Drying & IR Value improvement of Current Limiting Reactor
❖ Nitrogen Drying & IR Value improvement of Current Limiting Reactor
❖ Vapor Phase Drying & IR Value improvement of Current Limiting Reactor
Maintenance
CNT undertake onsite Routine & Major Maintenance Overhaul of Power Transformer.
Filtration, Recondition & Reclaim of Transformer Oil
❖ Filtration to improve its dielectric strength
❖ Recondition high vacuum dehydration to remove moisture content
❖ Reclaim to remove volatile acidic compound Arsenic, Fluoride & Sulfur
On-line, Live-line Filtration of Transformer Oil
❖ 11KV On-line Live-line Transformer Oil Filtration
❖ 22KV On-line Live-line Transformer Oil Filtration
❖ 110KV On-line Live-line Transformer Oil Filtration
❖ 132KV On-line Live-line Transformer Oil Filtration
❖ 220KV On-line Live-line Transformer Oil Filtration
Routine Maintenance of Power Transformer
❖ Testing of Transformer Oil
❖ Testing of Power Transformer
❖ Maintenance of Transformer
❖ Maintenance of OLTC/Diverter switch
❖ Attending oil Leakages of Transformer
❖ Attending oil Leakages of OLTC/Diverter switch
Major Maintenance of Power Transformer
❖ Overhauling of Transformer
❖ Overhauling of OLTC/Diverter switch
❖ Oil Replacement of OLTC/Diverter switch
❖ Internal Fault Analysis of Transformer
❖ Remnant Life Assessment of Transformer
❖ Vacuum Drying & IR value improvement of Transformer
❖ Oil Replacement, Drying & IR value improvement of Transformer
❖ Nitrogen Drying & IR Value improvement of Transformer
❖ Vapor Phase Drying & IR Value improvement of Transformer
Dry Type (Epoxy) Transformer Servicing
❖ Annual (One Time) Maintenance & Servicing of Dry-type Transformer
❖ Replacement of Cross Ventilation Cooling Fan of Dry-type Transformer

Testing
CNT undertake onsite & at works Testing of Transformer Oil, Power Transformer, Current Transformer, Potential Transformer, Residual Voltage Transformer & Current Limiting Reactor.

Testing of Transformer Oil
❖ Electrical Properties Analysis
✦ Dielectric Strength Test
✦ Dielectric Dissipation Factor Test
✦ Specific Resistance Test
❖ Chemical Properties Analysis
✦ Neutralization Value Test
✦ Water Content Test
✦ Sediments & Sludge Test
❖ Physical Properties Analysis
✦ Physical condition & Appearance Test
✦ Density Test
✦ Flash Point Test
✦ Inter Facial Tension Test
✦ Kinematic Viscosity Test
✦ Pour Point Test
❖ Power Transformer Internal Fault Analysis
✦ Dissolved Gases Analysis (DGA)
★ Total Dissolved Combustible Gas
★ Concentration of component gases
⚬ Hydrogen H2
⚬ Oxygen O2
⚬ Nitrogen N2
⚬ Carbon Monoxide CO
⚬ Carbon Dioxide CO2
⚬ Methane CH4
⚬ Ethane C2H6
⚬ Ethylene C2H4
⚬ Acetyline C2H2
⚬ Propane C3H8
⚬ Propylene C3H6
❖ Power Transformer Remnant Life Assessment
✦ FURAN Analysis
✦ 2,6-di-tert-Butyl p-Cresol (DBPC) Analysis &
2,6-di-tert-Butyl Phenol (DBP) Analysis
❖ Transformer Oil Remnant Life Assessment
✦ Polychlorinated Biphenlyls (PCB's) Analysis
✦ Corrosive Sulphur Test
✦ Oxidation Stability
Testing of Power Transformer
❖ Insulation Condition Analysis
✦ Insulation Resistance & Polarization Index Test
✦ Dissipation Factor (Tan δ) Test of Insulation Capacitance
✦ Capacitance Test
✦ Induced High Voltage Test
✦ Power Frequency High Voltage Test
✦ Double Frequency High Voltage Test
❖ Winding Condition Analysis
✦ HV Winding Resistance Test at 75℃
✦ LV Winding Resistance Test at 75℃
❖ Core-Coil Assembly Condition Analysis
✦ Verification of Terminals & Polarity Test
✦ Magnetic Balance Test
✦ Magnetization Current Test
✦ No Load Loss Test
✦ No Load Current Test
✦ No Load Current Harmonics Test
✦ Full Load Loss Test
✦ Short-Circuit Impedance Test
✦ Zero-Sequence Impedance Test
✦ Ratio Test on all tap position
✦ Vector Group Test
✦ Sweep Frequency Response Analysis Test
✦ Sound Level Test
❖ On-load Tap-Changer Assembly Condition Analysis
✦ Operation Test
✦ Auxiliary Circuit Insulation Test
❖ Control Simulation Analysis
✦ MOG Operation Test
✦ Buchholz Relay Operation Test
✦ OSR Operation Test
✦ PRD Test Operation Test (Main tank)
✦ PRD Test Operation Test (OLTC tank)
✦ OTI Calibration Test
✦ WTI Calibration Test
❖ Earthing Pit Analysis
✦ Earth Resistance Test
Testing of Current Transformer
❖ Insulation Condition Analysis
✦ Insulation Resistance Test
✦ Tan Delta (Tan δ) & Capacitance Test
✦ Overvoltage Interturn Test
✦ Power Frequency High Voltage Test
✦ Double Frequency High Voltage Test
❖ Winding Condition Analysis
✦ Primary Winding Resistance Test at 75℃
✦ Secondary Winding Resistance Test at 75℃
❖ Core-Coil Assembly Condition Analysis
✦ Verification of Terminals & Polarity Test
✦ Magnetization Curve Test
✦ Knee Point Voltage Test
✦ Composite Error Test
✦ Ratio Error Test
✦ Phase Angle Error Test
✦ Temperature Rise Test
Testing of Potential Transformer
❖ Insulation Condition Analysis
✦ Insulation Resistance Test
✦ Capacitance & Tan Delta (Tan δ) Test
✦ Induced High Voltage Test
✦ Power Frequency High Voltage Test
✦ Double Frequency High Voltage Test
❖ Winding Condition Analysis
✦ Primary Winding Resistance Test at 75℃
✦ Secondary Winding Resistance Test at 75℃
❖ Core-Coil Assembly Condition Analysis
✦ Verification of Terminals & Polarity Test
✦ Ratio Error Test
✦ Phase Angle Error Test
✦ Temperature Rise Test
Testing of Residual Voltage Transformer
❖ Insulation Condition Analysis
✦ Insulation Resistance Test
✦ Capacitance & Tan Delta (Tan δ) Test
✦ Induced High Voltage Test
✦ Power Frequency High Voltage Test
✦ Double Frequency High Voltage Test
❖ Winding Condition Analysis
✦ Primary Winding Resistance Test at 75℃
✦ Secondary Winding Resistance Test at 75℃
❖ Core-Coil Assembly Condition Analysis
✦ Verification of Terminals & Polarity Test
✦ Open Delta Test
✦ Ratio Error Test
✦ Phase Angle Error Test
✦ Temperature Rise Test
Testing of Current Limiting Reactor
❖ Insulation Condition Analysis
✦ Insulation Resistance Test
✦ Capacitance & Tan Delta (Tan δ) Test
✦ Induced High Voltage Test
✦ Power Frequency High Voltage Test
✦ Double Frequency High Voltage Test
❖ Winding Condition Analysis
✦ Winding Resistance Test at 75℃
❖ Coil Assembly Condition Analysis
✦ Reactance Test
✦ Temperature Rise Test
✦ Full Load Loss Test
✦ Short-Circuit Impedance Test
Consultancy
CNT provides service of Engineering & Technical Consultancy for Power Projects in concept stage, design & development stage, tendering stage & execution stage.
CONCEPT STAGE
❖ Data Collection from Client through RFI
❖ Analysis of collected Data
❖ Preparation of DBR
❖ Approval of DBR from authority
❖ Preparation of Conceptual Design Drawings for approval from authority
DESIGN & DEVELOPMENT STAGE
❖ Submission of DBR to Client
❖ Submission of Schematic Drawing to Client
TENDER STAGE
❖ Preparation of Drawing & Documents for tendering
❖ Preparation of BOQ & Budgetary Estimate
❖ Pre-bid Technical discussion with Vendor
❖ Raising RFQ to approved Vendors
❖ Preparation of Comparative Statement of quotations with estimates
❖ Preparation of Work Schedule
EXECUTION STAGE
❖ Issuing all the GFC drawing & SLD for execution of project
❖ Approval of Shop drawing, GA drawing submitted by contractor
❖ Suggesting various measures to reduce project cost
❖ Regular visits to site for supervision of installation, testing and commissioning
❖ Interaction with site engineers & maintaining quality of work